青岛旭清机械有限公司(胶南区)
主营产品:
2023年09月28日 17:50
类型 |
开放式 |
型号 |
XQ |
橡胶硫化罐 青岛硫化罐
加工定制:是
型号:RTA-1700
品牌:旭清
有效长度:4000(mm)
工作压力:0.8(MPa)
类型:硫化罐
样式:卧式
直径:1700(mm)
工作温度:0-200(℃)
主电动机功率:60-90(KW)
外形尺寸:4.8*1.8*2(m)
重量:2500(kg)
橡胶硫化罐 青岛硫化罐主要的技术参数: 型号 Ф0.8×L Ф 1.2×L Ф1.7×L 罐体内径(m) 0.8 1.2 1.7 罐体有效长度L(m) 3;5;11;22 3;5;11;22 4;6;8;10 工作压力Mpa 0.45 0.6 1.3 工作温度℃ 145 160 194 加热升压方式 蒸汽;电加热 蒸汽;电加热 蒸汽;电加热 橡胶硫化罐 青岛硫化罐产品描述:
用途:硫化罐主要用于硫化胶鞋、胶管、胶辊、胶带、皮球、衬胶、橡胶布、橡皮头等橡胶制品,也可用于硫化其他模型橡胶制品。
硫化罐爆炸的预防:
1.加强对职工进行安全教育培训;
2.在生产前,必须对硫化罐进行细致检查,并清除罐内障碍杂物,把好进料质量;
3.工作中要精力集中,坚守岗位,时刻注意设备运转情况,以及周围的安全情况;
4.工作结束要切断电源开关,检查所有的按钮、手柄是否在零位;关闭蒸汽、水等所有阀门,打开回水阀门。
5.遇到异常情况时,应采取应急措施,及时报告,必要时撤离现场。
Brand name: SUITEQUE
Condition:new
Effective length: 4000 (mm)
Pressure of work: 0.8 (MPa)
Type: vulcanizing pot
Style: horizontal
Diameter: 1700 (mm)
Working temperature: 0-200 ℃)
The main motor power: 60-90 (KW)
Dimensions: 4.8 * 1.8 * 2 (m)
Weight: 2500 (kg)
The main technical parameters: Model number Ф0.8×L Ф 1.2×L Ф1.7×L Tank diameter (m) 0.8 1.2 1.7 Tanks effective length L (m) 3;5;11;22 3;5;11;22 4;6;8;10 Working pressure Mpa 0.45 0.6 1.3 Working temperature ℃ 145 160 194 Booster heating way Steam;Electric heating Steam;Electric heating Steam;Electric heating Packaging & Delivery:
Packaging detail:Standard Exporting Package
Delivery detail:2 months after receiving the deposit
Specifications:
1.Reasonable structure
2.Easy to operate
3.Energy saving
4.Safe and reliable
Product description:
Purpose: vulcanizing tank is mainly used for vulcanized rubber shoes, rubber hose, rubber roller, rubber tape, rubber ball, rubber lining, cloth, rubber top rubber products, rubber products can also be used to cure other model.
The vulcanizing tank explosion prevention:
1. To strengthen safety education training to the worker;
2. Before production, it must be a detailed examination of the vulcanizing tank, and tank clearance of sundry, the good material quality;
3. To concentrate at work, work, attention to the workings of the equipment, as well as the security situation around;
4. Close to cut off the power switch, check whether all the buttons, the handle in zero;Close the steam, water, etc. All valves, open the water valve.
5. Meet with abnormal situation, should take emergency measures, timely report, when it is necessary to evacuate the scene.
联系电话: 联系人:李经理 网址:
联系方式